Is the plumbing under Sur ready for the 2040 story?

Infrastructure is the silent constraint. Roads, water and utility access are usually what separates a strategy on the page from an economy that runs. For Sur, the honest read comes down to roads executed and water connections.

117 km

Roads executed

That puts Sur at 8 of 11 on the official table.

58,158

Water connections

That puts Sur at 6 of 11 on the official table.

The numbers

Where Sur stands today, chart by chart

Roads executed

Total executed road length by governorate in 2025, combining graded, dual and single roads.

Ranking chart showing roads executed across Oman's governorates, with Ash Sharqiyah South highlighted.0 km149 km299 km448 km597 kmAd Dakhiliyah597 kmMuscat567 kmDhofar412 kmAsh Sharqiyah North263 kmAl Batinah South260 kmAl Wusta139 kmAdh Dhahirah120 kmAsh Sharqiyah South117 kmAl Batinah North90 kmAl Buraymi62 kmMusandam5 km

NCSI Statistical Year Book 2026, Roads Executed Lengths by Governorates.

Water connections

Total water connections by governorate in 2025.

Ranking chart showing water connections across Oman's governorates, with Ash Sharqiyah South highlighted.085,339170,678256,016341,355Muscat341,355Al Batinah North118,137Dhofar93,106Al Batinah South75,432Ad Dakhiliyah71,624Ash Sharqiyah South58,158Ash Sharqiyah North29,708Adh Dhahirah27,164Al Buraymi24,091Musandam11,661Al Wusta5,650

NCSI Statistical Year Book 2026, Production and Distribution of Water and No.of Connections by Governorate.

The trend over time

How Sur got here

Water connections

Water connections in homes and businesses, year by year. The simplest way to see whether utility coverage is actually keeping up as the governorate grows.

Time-series chart showing water connections for Ash Sharqiyah South using only official governorate data.53,31654,70056,08357,46658,85020222023202420252022: 53,8352025: 58,158Official actual

2022–2024 from the Production and Distribution of Water and No. of Connections by Governorate table in Statistical Year Book 2025 (Issue 53). 2025 from the equivalent table in Statistical Year Book 2026 (Issue 54).

Reading the charts

What the latest tables are really saying

  • Sur is showing 117 km on roads executed. That puts Sur at 8 of 11 on the official table.
  • Sur is showing 58,158 on water connections. That puts Sur at 6 of 11 on the official table.
  • The official MOHUP role is unambiguous: Ash Sharqiyah South should become a leading centre for marine activity, balancing industry, fisheries, marine research, tourism, agriculture and the environmental constraints of the coast. Roads, water and power are the quiet layer underneath — get them wrong and nothing else really runs.

Why this file matters

The strategy Sur is being measured against

Roads, water and the quiet base layer that usually decides whether any of the rest of it actually works.

The official MOHUP role is unambiguous: Ash Sharqiyah South should become a leading centre for marine activity, balancing industry, fisheries, marine research, tourism, agriculture and the environmental constraints of the coast.

  • Sur is meant to operate as a stronger urban, commercial and tourism centre.
  • Marine-linked sectors are supposed to range from fisheries and research to administration and tourism rather than sitting in a narrow niche.
  • The strategy repeatedly stresses the need to keep marine and coastal growth in balance with fragile environmental conditions.