Is the plumbing under Duqm ready for the 2040 story?

Infrastructure is the silent constraint. Roads, water and utility access are usually what separates a strategy on the page from an economy that runs. For Duqm, the honest read comes down to roads executed and water connections.

139 km

Roads executed

That puts Duqm at 6 of 11 on the official table.

5,650

Water connections

That puts Duqm at 11 of 11 on the official table.

The numbers

Where Duqm stands today, chart by chart

Roads executed

Total executed road length by governorate in 2025, combining graded, dual and single roads.

Ranking chart showing roads executed across Oman's governorates, with Al Wusta highlighted.0 km149 km299 km448 km597 kmAd Dakhiliyah597 kmMuscat567 kmDhofar412 kmAsh Sharqiyah North263 kmAl Batinah South260 kmAl Wusta139 kmAdh Dhahirah120 kmAsh Sharqiyah South117 kmAl Batinah North90 kmAl Buraymi62 kmMusandam5 km

NCSI Statistical Year Book 2026, Roads Executed Lengths by Governorates.

Water connections

Total water connections by governorate in 2025.

Ranking chart showing water connections across Oman's governorates, with Al Wusta highlighted.085,339170,678256,016341,355Muscat341,355Al Batinah North118,137Dhofar93,106Al Batinah South75,432Ad Dakhiliyah71,624Ash Sharqiyah South58,158Ash Sharqiyah North29,708Adh Dhahirah27,164Al Buraymi24,091Musandam11,661Al Wusta5,650

NCSI Statistical Year Book 2026, Production and Distribution of Water and No.of Connections by Governorate.

The trend over time

How Duqm got here

Water connections

Water connections in homes and businesses, year by year. The simplest way to see whether utility coverage is actually keeping up as the governorate grows.

Time-series chart showing water connections for Al Wusta using only official governorate data.1,2552,5113,7665,0226,27820222023202420252022: 1,7262025: 5,650Official actual

2022–2024 from the Production and Distribution of Water and No. of Connections by Governorate table in Statistical Year Book 2025 (Issue 53). 2025 from the equivalent table in Statistical Year Book 2026 (Issue 54).

Reading the charts

What the latest tables are really saying

  • Duqm is showing 139 km on roads executed. That puts Duqm at 6 of 11 on the official table.
  • Duqm is showing 5,650 on water connections. That puts Duqm at 11 of 11 on the official table.
  • MOHUP's strategy for Al Wusta is centered on Duqm as a national gateway and business hub, Hayma as a regional service centre, and a wider transition toward manufacturing, petrochemicals, fisheries and renewables inside a vast low-density geography. Roads, water and power are the quiet layer underneath — get them wrong and nothing else really runs.

Why this file matters

The strategy Duqm is being measured against

Roads, water and the quiet base layer that usually decides whether any of the rest of it actually works.

MOHUP's strategy for Al Wusta is centered on Duqm as a national gateway and business hub, Hayma as a regional service centre, and a wider transition toward manufacturing, petrochemicals, fisheries and renewables inside a vast low-density geography.

  • Duqm is expected to provide a full urban platform, not just an industrial zone disconnected from resident life.
  • The region's geography is treated as an advantage for renewables, large-scale industry and wilderness tourism.
  • Distance and sparse settlement are major design constraints, which is why Hayma and other local centres matter.