Is the plumbing under Khasab ready for the 2040 story?

Infrastructure is the silent constraint. Roads, water and utility access are usually what separates a strategy on the page from an economy that runs. For Khasab, the honest read comes down to roads executed and water connections.

5 km

Roads executed

That puts Khasab at 11 of 11 on the official table.

11,661

Water connections

That puts Khasab at 10 of 11 on the official table.

The numbers

Where Khasab stands today, chart by chart

Roads executed

Total executed road length by governorate in 2025, combining graded, dual and single roads.

Ranking chart showing roads executed across Oman's governorates, with Musandam highlighted.0 km149 km299 km448 km597 kmAd Dakhiliyah597 kmMuscat567 kmDhofar412 kmAsh Sharqiyah North263 kmAl Batinah South260 kmAl Wusta139 kmAdh Dhahirah120 kmAsh Sharqiyah South117 kmAl Batinah North90 kmAl Buraymi62 kmMusandam5 km

NCSI Statistical Year Book 2026, Roads Executed Lengths by Governorates.

Water connections

Total water connections by governorate in 2025.

Ranking chart showing water connections across Oman's governorates, with Musandam highlighted.085,339170,678256,016341,355Muscat341,355Al Batinah North118,137Dhofar93,106Al Batinah South75,432Ad Dakhiliyah71,624Ash Sharqiyah South58,158Ash Sharqiyah North29,708Adh Dhahirah27,164Al Buraymi24,091Musandam11,661Al Wusta5,650

NCSI Statistical Year Book 2026, Production and Distribution of Water and No.of Connections by Governorate.

The trend over time

How Khasab got here

Water connections

Water connections in homes and businesses, year by year. The simplest way to see whether utility coverage is actually keeping up as the governorate grows.

Time-series chart showing water connections for Musandam using only official governorate data.10,69110,96811,24511,52211,80020222023202420252022: 10,7952025: 11,661Official actual

2022–2024 from the Production and Distribution of Water and No. of Connections by Governorate table in Statistical Year Book 2025 (Issue 53). 2025 from the equivalent table in Statistical Year Book 2026 (Issue 54).

Reading the charts

What the latest tables are really saying

  • Khasab is showing 5 km on roads executed. That puts Khasab at 11 of 11 on the official table.
  • Khasab is showing 11,661 on water connections. That puts Khasab at 10 of 11 on the official table.
  • MOHUP positions Musandam around eco-tourism, fisheries, agriculture, quarrying and its unique geographic position. Roads, water and power are the quiet layer underneath — get them wrong and nothing else really runs.

Why this file matters

The strategy Khasab is being measured against

Roads, water and the quiet base layer that usually decides whether any of the rest of it actually works.

MOHUP positions Musandam around eco-tourism, fisheries, agriculture, quarrying and its unique geographic position. The spatial strategy emphasises controlled development, functional zoning and the protection of natural beauty as the basis of future growth.

  • Tourism is explicitly framed as the main driver of Musandam's future economy.
  • The strategy still expects supporting roles from fisheries, agriculture, trade and quarrying rather than a one-sector story.
  • The official planning approach is unusually spatially strict because land claiming, ecological protection and phased master plans all matter here.