Back to Adh Dhahirah

Ibri · Topic file

Is the plumbing under Ibri ready for the 2040 story?

Infrastructure is the silent constraint. Roads, water and utility access are usually what separates a strategy on the page from an economy that runs. For Ibri, the honest read comes down to roads executed and water connections.

120 km

Roads executed

That puts Ibri at 7 of 11 on the official table.

27,164

Water connections

That puts Ibri at 8 of 11 on the official table.

The numbers

Where Ibri stands today, chart by chart

Roads executed

Total executed road length by governorate in 2025, combining graded, dual and single roads.

Ranking chart showing roads executed across Oman's governorates, with Adh Dhahirah highlighted.0 km149 km299 km448 km597 kmAd Dakhiliyah597 kmMuscat567 kmDhofar412 kmAsh Sharqiyah North263 kmAl Batinah South260 kmAl Wusta139 kmAdh Dhahirah120 kmAsh Sharqiyah South117 kmAl Batinah North90 kmAl Buraymi62 kmMusandam5 km

NCSI Statistical Year Book 2026, Roads Executed Lengths by Governorates.

Water connections

Total water connections by governorate in 2025.

Ranking chart showing water connections across Oman's governorates, with Adh Dhahirah highlighted.085,339170,678256,016341,355Muscat341,355Al Batinah North118,137Dhofar93,106Al Batinah South75,432Ad Dakhiliyah71,624Ash Sharqiyah South58,158Ash Sharqiyah North29,708Adh Dhahirah27,164Al Buraymi24,091Musandam11,661Al Wusta5,650

NCSI Statistical Year Book 2026, Production and Distribution of Water and No.of Connections by Governorate.

The trend over time

How Ibri got here

Water connections

Water connections in homes and businesses, year by year. The simplest way to see whether utility coverage is actually keeping up as the governorate grows.

Time-series chart showing water connections for Adh Dhahirah using only official governorate data.24,50225,26226,02326,78427,54420222023202420252022: 24,7872025: 27,164Official actual

2022–2024 from the Production and Distribution of Water and No. of Connections by Governorate table in Statistical Year Book 2025 (Issue 53). 2025 from the equivalent table in Statistical Year Book 2026 (Issue 54).

Reading the charts

What the latest tables are really saying

  • Ibri is showing 120 km on roads executed. That puts Ibri at 7 of 11 on the official table.
  • Ibri is showing 27,164 on water connections. That puts Ibri at 8 of 11 on the official table.
  • MOHUP frames Adh Dhahirah around high-value production, engineering industries, logistics, food manufacturing, advanced agriculture and renewable energy, with Ibri acting as the main urban and knowledge anchor. Roads, water and power are the quiet layer underneath — get them wrong and nothing else really runs.

Why this file matters

The strategy Ibri is being measured against

Roads, water and the quiet base layer that usually decides whether any of the rest of it actually works.

MOHUP frames Adh Dhahirah around high-value production, engineering industries, logistics, food manufacturing, advanced agriculture and renewable energy, with Ibri acting as the main urban and knowledge anchor.

  • Ibri, Dank and Yanqul are meant to develop complementary economic roles rather than compete as isolated settlements.
  • Higher education, an incubator cluster and a tech-park logic are part of the official production story here.
  • Renewable energy, especially solar, is treated as a serious economic advantage for the governorate.

Related topic files

Five more ways into the Adh Dhahirah execution map

These linked files cover the other live tests in the same governorate, so the numbers on capital, jobs, services, tourism, utilities, and urban buildout can be read together instead of in isolation.